Information
Road: Byron Township
Limits: Neighborhood Streets
Work: Resurfacing
Start: TBD
Completion: TBD
Traffic: Expect Delays
Authority: KCRC
Contractor: Rieth-Riley Construction
Funding: 50% KCRC/50% Byron Township
The Kent County Road Commission (KCRC) in collaboration with Byron Township is contracting with Rieth-Riley to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and September 1, 2023, weather permitting.
- Railside Dr: 76th St to Byron Station
- Railside Ct: Railside Dr. to End
- Beech Tree Dr: Railside Dr. to Byron Station Dr
- Byron Station Dr: Beech tree Dr to Byron Center Ave.
- Byron Station Ct: Byron Station Dr. to End
- Marfield Dr: Byron Center Ave to Parlo St
- Parlo Street: Marfield Drive to LaJean Drive
- Lajean Drive: Marfield Drive to End
- Red Osier Ct: Red Osier Drive to End
- Red Osier Dr: 76th Street to End
- Rush Creek Dr: Ivanrest to End
- Rush Creek Court: Rush Creek to End
- Bruce Scott Ct: Kelly Lee Dr to End
- Byron Shores Ct: Byron Shores Dr to End
- Byron Shores Drive: 68th Street to Byron Center Avenue
- Cattail Drive: 72nd St. to Lilly Pad Drive
- Country Springs Drive: Byron Shores Drive to Lily Pad Drive
- Egret Drive: Windrift Drive to Osprey Drive
- Kelly Lee Drive: 72nd Street to Byron Shores Drive
- Lilly Pad Drive: Country Springs Avenue to Windrift Drive
- Osprey Drive: Winterwind Drive to 72nd Street
- Windrift Drive: Lilly Pad Drive to Winterwind Drive
- Winterwind Drive: Windrift Drive to Osprey Drive
- Dust Rose Street: Indigo Ridge Drive to End
- Indigo Ridge Court: Indigo Ridge Drive to End
- Indigo Ridge Drive: Southwood Avenue to 76th Street
- Southwood Avenue: 72nd Street to End
- Homerich Ave: 92nd to 84th Street
- Ivanrest Ave: 60th Street to 76th Street
- 76th Street: Kenowa Avenue to Wilson Avenue