Road Limits Work Start Completion Authority Traffic
6 Mile Road M-37 and N. Division Ave Railroad Work 10/18/23 10/19/23 Closed to All Traffic

Closed at railroad tracks for track repair.

60th Street East Paris, east for approx. ½ mile Permit Work 10/11/23 10/31/23 Lane Closures

Right lane closed for sidewalk and curb repair.

7 Mile Road .2 Miles west of Pine Island Drive Utility Work 10/09/23 10/18/23 Permit-Holder Detour for Through Traffic

For new plat construction:
--cut in and place new sanitary manhole on 7 Mile.
--live tap and run watermain across 7 Mile.

Morgan Mills (Oakfield Bridge 9) Over Wabasis Creek Bridge Improvement 10/02/23 11/18/23 KCRC Closed to All Traffic

Removal of twin corrugated metal pipe arches (CMPAs) and replacement with twin 148" span x 93" rise twin CMPAs. Project will require an extensive cofferdam. Permanent sheet piling will be installed along west side of roadway, near adjacent boat ramp. Project includes new guardrail, and roadway reconstruction at the immediate installation. River flow will be maintained for small boat traffic. 


Roadway traffic will be detoured via 12 Mile Road, Lincoln Lake Avenue and 14 Mile Road. 

Ada Drive Spaulding Avenue to Rix Street Mill and Fill 09/30/23 10/10/23 KCRC Detour for Through Traffic

Spot mill and fill of the eastbound and westbound lanes of Ada Drive from Spaulding Avenue to Rix Street - expect delays.

Egan Avenue 60th Street to 68th Street Mill and Fill 09/29/23 10/13/23 KCRC Detour for Through Traffic

Resurfacing project: mill and fill

Clyde Park Avenue (NB) 92nd Street to 100th Street Utility Work 09/19/23 10/13/23 Utility Lane Closures

Right lane closure for utility work

60th Street Clyde Park Avenue and Burlingame Avenue Utility Work 09/18/23 11/22/23 Utility Detour

Water and sanitary sewer installation

Plainfield Township Local/Neighborhood Streets Resurfacing 09/15/23 10/06/23 KCRC Expect Delays

The Kent County Road Commission (KCRC) in collaboration with Plainfield Township is contracting with Rieth-Riley to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and August 31, 2023, weather permitting.

Notice to Property Owners

  • Ancliff Drive: Gateshead Drive to Gateshead Drive
  • Archer Avenue: Kuttshill Drive to Knollwood Drive
  • Blythefield Avenue: Rogue River Road to Meadowlark Drive
  • Blythefield Avenue: Meadowlark Drive to Knollwood Drive
  • Blythefield Avenue: Knollwood Drive to Ancliff Drive
  • Brook Hollow Drive: Packer Drive to End
  • Gateshead Drive: Packer Drive to Kuttshill Drive
  • Knollwood Drive: Archer Avenue to Meadowlark Drive
  • Meadowlark Drive: Knollwood Drive to Archer Avenue
  • Sunny Hill Court: Blythefied Avenue to End
  • Sunny Hill Street: Packer Drive to Meadowlark Drive
  • Thistle Dhu Street: Blythefield Avenue to Archer Drive
  • Blythefield Avenue Stub: Keswick Drive to End
  • Gold Dust Drive: Packer Drive to End
  • Gold Dust Street: Northedge Drive to Las Vegas Drive
  • Keswick Drive: E/ Gold Dust Drive to W/ Blythefield Avenue
  • Las Vegas Drive: Packer Drive to End
  • Northedge Drive: Northland Drive to Gold Dust Street
  • Nugget Avenue: Gold Dust Drive to Las Vegas Drive
  • Gold Dust Street: Packer Drive to End
  • Rapidfall Court: Rapidfall Drive to End
  • Rapidfall Drive: Woodwater Drive to Gold Dust Drive
  • Rogue Hill Court: Packer Drive to End
  • Rogue Rapids Court: Gold Dust Street to End
  • Rogueview Court: Gold Dust Street to End
  • Woodwater Drive: Rogue River Road to Rapidfall Drive
  • Brisam Street: Bonneville to West End
  • Northville Drive: 5 Mile Road to Brisam Street
  • Sandalwood Court (East): Northville Drive to End
  • Sandalwood Court (West): Northville Drive to End
  • West Lake Court: Northville Drive to End
  • Rocky Mountain Street: Trailview Drive to End
  • Trailview Drive: 5 Mile to End
  • Northvale Drive: 5 Mile Road to Sawkaw Drive
  • SawKaw Drive: 5 Mile Road to Kewadin Drive
  • Algonquin Court: Keeweenaw to End
  • Cree Court: Summitview Drive to End
  • Crownknoll Court: Summitview Drive to End
  • Crownview Court: Summitview to End
  • Jasmine Avenue: 4 Mile Road to End
  • Manitoba Court: Keeweenaw Drive to End
  • Manitou Drive: Northville Dr to End
  • Nipawin Court: Keeweenaw Dr. to End
  • Russview Court: Russview Dr to End
  • Russview Drive: Summitview Dr to End
  • Summitview Court: Summitview Drive to End
  • Summitview Drive: 4 Mile Road to Manitou Drive
  • Wausaukee Court (East): Summitview Drive to End
  • Wausaukee Court (West): Summitview Drive to End
  • Danube Court: Wabash to End
  • Rock River Drive: Coit Avenue to Wabash Drive
  • Wabash Court: Wabash Drive to End
  • Wabash Drive: Coit Avenue to Coit Avenue
Summit Avenue 11 Mile Road to 12 Mile Road Utility Work 09/14/23 11/01/23 Utility Detour

Watermain work.

Spaulding Avenue (Railroad) at Railroad Crossing Railroad Work 08/28/23 09/06/23 Permit-Holder Detour

Project consists of railroad crossing replacement.

MacClain Street Wabasis Avenue to Heintzelman Avenue Reconstruction 08/23/23 10/31/23 KCRC Detour

Reconstruction from gravel to pavement.

100th Street East Paris Avenue to Patterson Avenue Reconstruction 08/21/23 11/16/23 KCRC Detour for Through Traffic

Reconstruct to 2-lane all-season standard. Work includes tree removal, earthwork, ditches, culvert replacement, HMA pavement, pavement markings and restoration. Tree removal has been completed. 

Additional works includes repairing approximately 100 feet of the west bound lane with hot mix asphalt, styrofoam blocks, and aggregate base, on 100th Street approximately 2500 foot east of East Paris Avenue in Gaines Township.  Thru traffic will be detoured to 84th Street utilizing the same detour already set up for the reconstruction project between East Paris and Patterson Avenue.

68th Street East of Clay Avenue at Railroad Crossing Railroad Work 08/21/23 08/27/23 Permit-Holder Detour

Reconstruction of the RR crossing

Lamoreaux Drive East of Stony Creek Permit Work 08/16/23 08/21/23 Permit-Holder Lane Closures

Right lane closed for driveway work.

Byron Depot Drive east of Homrich Avenue Utility Work 08/16/23 09/04/23 Detour

Replacing sanitary sewer, which ties to the manhole in the middle of Byron Depot. Detour: Use temporary road.

Knapp Street west of I-96 Permit Work 08/14/23 08/18/23 Lane Closures

Right lane closed for driveway work.

92nd Street east of Clyde Park Avenue Utility Work 08/14/23 08/23/23 Permit-Holder Lane Closures

Right lane closed gas main installation.  

Ada Drive Forest Hills Avenue and Spaulding Avenue Mill and Fill 08/10/23 08/18/23 KCRC Detour for Through Traffic

Ada Drive from Forest Hills Avenue to Spaulding Avenue will be milled full depth then repave. Spaulding Avenue / Ada Drive intersection and Spaulding Avenue 375 ft. north to Connemara Court will be milled partial depth (2”) and repaved.

E. Paris Ave From the Kentwood City limits to the 1100 block Utility Work 08/07/23 08/10/23 KCRC Lane Closures

Northbound E. Paris from the Kentwood City limits to the 1100 block the far right curb lane will be closed for utility work. Both daytime and nighttime closure

12 Mile Rd Over US- 131 Bridge Improvement 08/07/23 08/14/23 KCRC Closed to All Traffic

12 Mile Rd over US-131 will be closed for bridge work

Clyde Park Avenue at 60th Street Utility Work 08/07/23 08/15/23 Utility Closed to All Traffic

Installing sanitary sewer metering system in connection with City of Wyoming sewer.

Egypt Valley Ave at 2 Mile Rd Utility Work 08/01/23 08/03/23 KCRC Lane Closures

Northbound Egypt Valley at 2 Mile will have a lane closure for gas main install.

Northland Dr at Cedar Springs Ave intersection Intersection Work 07/26/23 08/11/23 KCRC Lane Closures

Northland Dr at Cedar Springs Ave intersection will have closures for intersection realignment and reconstruction. This project will be done in two stages: Phase 1 will consist of closing Northland Drive and the construction of Northland Drive north of Cedar Springs Avenue, and the relocated intersection of Cedar Springs Avenue. Phase 2 will consist of closing Cedar Springs Avenue between Northland Drive and Egner Street. This phase shall consist of the remaining relocation of Cedar Springs Avenue and the completion of Northland Drive between 18 Mile and Cedar Springs Ave

Buttrick Ave Thornapple River Dr to Grand River Dr Resurfacing 07/24/23 08/03/23 KCRC Closed to All Traffic

Buttrick Ave from Thornapple River Dr to Grand River Dr will be closed for a mill and repave

Coit Avenue Rifle Range Avenue to Hunsberger Avenue Crush & Shape 07/17/23 08/10/23 KCRC Detour for Through Traffic

COit Avenue from Rifle Range Road to Hunsberger Avenue will be crushed, shaped and  repaved. This project will be completed using a detour, local traffic will be maintained.

10 Mile Rd from Wolven Ave to Childsdale Ave Utility Work 07/17/23 07/24/23 KCRC Lane shift

10 Mile Rd from Wolven Ave to Childsdale Ave will have traffic shifts for watermain installation

Thornapple Dr intersection with Tanglewood Dr Utility Work 07/17/23 07/28/23 KCRC Lane Closures

The intersection of Thornapple River Dr and Tanglewood Dr will have lane closures for watermain installation

Wabasis Ave 15 Mile Rd to MacClain St Road Work 07/13/23 10/13/23 KCRC Closed to All Traffic

Wabasis Ave from 15 Mile Rd to MacClain St will be closed for road construction

Parnell Avenue/Settlewood Drive M-21 (Fulton Street) to Foreman Street Crush & Shape 07/10/23 08/01/23 KCRC Detour for Through Traffic

Crush and shape the existing asphalt surface and place two courses of HMA pavement. 

Northland Drive 12 Mile Road to 14 Mile Road Mill and Fill 07/10/23 08/07/23 KCRC Lane Closures

Full Depth Cold mill existing 5-lane asphalt surface and three courses of HMA pavement.  Milling and paving work will be phased to maintain two-way traffic at all times. 

Buttrick Avenue Grand River Drive to to 28th St Mill and Fill 07/07/23 07/21/23 KCRC Detour for Through Traffic

Full Depth Cold mill existing 2-lane asphalt surface and place 2 courses of HMA pavement. Project to be scheduled after July 9, 2023.

Grand River Drive Buttrick Avenue to Snow Avenue Mill and Fill 06/21/23 07/07/23 KCRC Detour for Through Traffic

Mill & Fill is a structural pavement treatment that involves the removal of the existing surface layer with a milling machine and the replacement of the milled location with new asphalt. 

100th St. West of Byron Center Ave Utility Work 06/20/23 07/28/23 KCRC Lane Closures

Eastbound 100th St west of Byron Center Ave will have the right lane closed for utility work

Ada Drive (7AM-7PM) Schoolhouse Drive and Bronson Street Permit Work 06/20/23 06/27/23 Permit-Holder Closed to All Traffic

Painting of murals at the train trestle site as part of the Downtown Development Authority's first public art initiative.

Kraft Ave from Johnson St to 100th St Road Work 06/19/23 08/10/23 Permit-Holder Detour

Kraft Ave from Johnson St to 100th St will be closed for road construction.

Calpax expansion: open-cut water main and storm sewer crossing Kraft Ave at Duncan Lake Middle School Entrance. Kraft Ave widening, all season road construction, commercial drive entrance. 

Homerich Ave from 84th St to 92nd St. Crush & Shape 06/19/23 07/14/23 KCRC Detour for Through Traffic

Homerich from 84th St to 92nd St will be closed for a crush, shape and repave.

Division Avenue 6 Mile Road to 7 Mile Road Mill and Fill 06/19/23 07/09/23 KCRC Detour for Through Traffic

Cold mill existing two-lane asphalt surface and place two courses of HMA pavement. Targeted for Spring/summer 2023 start.

Thornapple River Drive (7AM-7PM) Kamp Twins Drive to Fase Street Permit Work 06/17/23 06/20/23 Permit-Holder Closed to All Traffic

Information from Ada Downtown Development Authority: 

Notice of upcoming road closures along Thornapple River Dr SE and Ada Dr SE. Thornapple River Dr SE will be closed to through-traffic at the vehicular train trestle from Saturday, June 17 through Monday, June 19.

Ada Dr SE will be closed to through traffic at the vehicular train trestle from Tuesday, June 20 through Tuesday, June 27. These road closures will be in place to facilitate the painting of murals at the train trestle sites as part of the Downtown Development Authority’s first public art initiative.

We’re anticipating painting to take place between the hours of 7 am and 7 pm during the road closure timeline. There will be no overnight road closures. Thornapple River Dr SE and Ada Dr SE will open back up to through traffic when painting ends each day. Please refer to the road closure maps provided for additional details regarding the detours.

Further road closure details can be found on our website: https://bit.ly/adamurals.

We thank you for your cooperation, and we look forward to the successful completion of this project

84th St and Kalamazoo Ave Intersection Roundabout 06/12/23 08/02/23 KCRC Closed to All Traffic

Construct single-lane roundabout with concrete curb and gutter, 8-foot concrete sidewalk, asphalt paving, drainage, street lighting and restoration. Work will be phased and through traffic will be detoured. 

* preliminary work by Consumers Energy begins May 9 under lane shifts in preparation for the roundabout project.

  from 200' south of Sandy Bottom to address #12475 Utility Work 06/07/23 06/22/23 Utility Lane Closures

right lane closed for utility work

Podunk Ave from 200' south of Sandy Bottom to address #12475 Utility Work 06/07/23 06/29/23 Utility Lane Closures

right lane closed for utility work

Honey Creek Avenue Knapp Street to 4 Mile Road Crush & Shape 06/05/23 06/21/23 KCRC Detour for Through Traffic

Crush and shape the existing asphalt surface and place two courses of HMA pavement. Project will be scheduled spring/summer 2023. 

  • Honey Creek Avenue from 4 Mile Road to 5 Mile Road will receive chip seal and fog seal preventive maintenance surface treatments during the 2023 construction season.
Reeds Lake Boulevard (EGR) Hall Street to Manhattan Mill and Fill 06/05/23 06/16/23 KCRC Detour for Through Traffic

This project is being completed in partnership with the City of East Grand Rapids.

  • Cold mill existing two-lane asphalt surface and place 1-2 courses of HMA pavement.
  06/05/23 06/09/23
  TBD TBD KCRC
18 Mile Rd. (Tyrone Bridge 21) Over the Rogue River Bridge Rehabiliation 05/30/23 09/15/23 KCRC Detour

This bridge rehabilitation includes superstructure and partial substructure removal, guardrail and approach work.

13 Mile Road Shaner Avenue to Myers Lake Avenue Crush & Shape 05/24/23 06/09/23 KCRC Detour for Through Traffic

Crush and shape the existing asphalt surface and place two courses of HMA pavement. 

Eastern Avenue 68th Street to 76th Street Mill and Fill 05/23/23 06/09/23 KCRC Two-way traffic maintained

The project will include milling, or removing, the existing roadway surface and placing two (2) courses of new asphalt pavement. Pavement markings will then be applied. Two-way traffic will be maintained using traffic shifts. Motorists should anticipate delay.

Packer Drive (Plainfield Bridge No. 12) Packer Drive Over the Rogue River Bridge Rehabiliation 05/22/23 08/06/23 KCRC Closed to All Traffic

Project will consist of: Box Beam Removal, Bridge Rail Removal, Cold Milling, Box Beam Replacement, Post-Tensioning, HMA Paving and Guardrail upgrade.

 

                                           

84th Street Wingeier Avenue to Freeport Avenue Crush & Shape 05/15/23 05/26/23 KCRC Detour for Through Traffic

Crush and shape the existing asphalt surface and place 2 courses of HMA pavement. 

Buttrick Avenue 28th Street to Grand River Drive Culvert Work 05/10/23 05/18/23 KCRC Detour

Remove existing crosstiles/culverts and replace with new crosstiles/culverts. Daytime closures, only (7AM - 4PM). Road will be closed at the culvert.

Grand Rapids Township Neighborhood Streets Resurfacing 05/01/23 06/01/23 KCRC Expect Delays

The Kent County Road Commission (KCRC) in collaboration with Grand Rapids Township is contracting with Rieth-Riley to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and August 31, 2023, weather permitting.

  • Alta Vista Drive: Cascade Road to Robinson Road 
  • Brentwood Drive: Park Hills Drive to Morningside Drive 
  • Elmhurst Avenue: Cascade Road to Robinson Road 
  • Glenview Drive: Cascade Road to Robinson Road 
  • Hathaway Drive: Park Hills Drive to Morningside Drive 
  • Kingswood Drive: Cascade Road to Fulton Street 
  • Lakeview Drive: Cascade Road to Robinson Road 
  • Midland Drive: AltaVista Drive to Elmhurst Avenue 
  • Midland Drive: Lake View Drive to Morningside Drive 
  • Montvale Drive: Glenview Drive to Elmhurst Avenue
  • Morningside Drive: Cascade Road to Fulton Street 
  • Oak Hollow Drive: Lake View Drive to end (E. of Morningside) 
  • Park Hills Drive: Cascade Road to Fulton Streeet 
  • Uplands Drive: Park Hills Drive to Morningside Drive 
  • Reeds Lake: Hall Street to Gravel

Download Letter to Residents

Courtland Township Local/Neighborhood Streets Resurfacing 04/28/23 06/08/23 KCRC Expect Delays

The Kent County Road Commission (KCRC) in collaboration with Courtland Township is contracting with Michigan Paving and Materials to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and September, 2023, weather permitting.

  • 13 Mile Rd: Shaner Ave to Myers Lake Ave.
  • 11 Mile Rd: Myers Lake Ave. to Young Ave.
  • Berrigan Ave: 13 Mile Road to 14 Mile Road
  • Pine Lake Ave: 15 Mile Road to 16 Mile Road
Algoma Township Neighborhood Streets Resurfacing TBD TBD KCRC Expect Delays

The Kent County Road Commission (KCRC) in collaboration with Algoma Township is contracting with Michigan Paving and Materials to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and September, 2023, weather permitting.

  • Scenic Pines Ct: Scenic Pines Dr. to End
  • Scenic Pines Dr: Summit Avenue to End
  • Valley View Drive: 12 Mile Road to End
  • Division Ave: 13 Mile to 14 mile
  • Division Ave: 14 Mile to 15 mile
Byron Township Neighborhood Streets Resurfacing TBD TBD KCRC Expect Delays

The Kent County Road Commission (KCRC) in collaboration with Byron Township is contracting with Rieth-Riley to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and September 1, 2023, weather permitting.

  • Railside Dr: 76th St to Byron Station
  • Railside Ct: Railside Dr. to End
  • Beech Tree Dr: Railside Dr. to Byron Station Dr
  • Byron Station Dr: Beech tree Dr to Byron Center Ave.
  • Byron Station Ct: Byron Station Dr. to End
  • Marfield Dr: Byron Center Ave to Parlo St
  • Parlo Street: Marfield Drive to LaJean Drive
  • Lajean Drive: Marfield Drive to End
  • Red Osier Ct: Red Osier Drive to End
  • Red Osier Dr: 76th Street to End
  • Rush Creek Dr: Ivanrest to End
  • Rush Creek Court: Rush Creek to End
  • Bruce Scott Ct: Kelly Lee Dr to End
  • Byron Shores Ct: Byron Shores Dr to End
  • Byron Shores Drive: 68th Street to Byron Center Avenue
  • Cattail Drive: 72nd St. to Lilly Pad Drive
  • Country Springs Drive: Byron Shores Drive to Lily Pad Drive
  • Egret Drive: Windrift Drive to Osprey Drive
  • Kelly Lee Drive: 72nd Street to Byron Shores Drive
  • Lilly Pad Drive: Country Springs Avenue to Windrift Drive
  • Osprey Drive: Winterwind Drive to 72nd Street
  • Windrift Drive: Lilly Pad Drive to Winterwind Drive
  • Winterwind Drive: Windrift Drive to Osprey Drive
  • Dust Rose Street: Indigo Ridge Drive to End
  • Indigo Ridge Court: Indigo Ridge Drive to End
  • Indigo Ridge Drive: Southwood Avenue to 76th Street
  • Southwood Avenue: 72nd Street to End
  • Homerich Ave: 92nd to 84th Street
  • Ivanrest Ave: 60th Street to 76th Street
  • 76th Street: Kenowa Avenue to Wilson Avenue

Notice to Residents

Gaines Township Neighborhood Streets Resurfacing 04/28/23 09/01/23 KCRC Expect Delays

The Kent County Road Commission (KCRC) in collaboration with Gaines Township is contracting with Black Gold to complete a full-width repaving of select local streets. The project is to be completed within contract limits, May 1 and September 1, 2023, weather permitting.

  • 72nd St: Zinnea Ave to Eastern Ave
  • Aleda Avenue: 68th St. to Brownell St.
  • Aleda Court: Aleda Avenue to End
  • Belfast Avenue: Brownell St. to End
  • Brownell Court: Brownell St. to End
  • Brownell St: Aleda Ave to Old Lantern
  • Harvester Drive: Brooklyn Ave. to End
  • Marshall Avenue: Aleda Ave. to End
  • Mildred Ave: 68th St. to Brownell St.
  • Periwinkle Ave: south of 72nd to End
  • Swather Court: Swather Drive to End
  • Swather Dr: East & West of Brooklyn Ave
  • Windrow Street: Swather Drive to End
  • Windsong Ct: Brooklyn Ave. to End
  • Zinnia Ave: North & South of 72nd St
  • Alzalea Drive: 72nd Street to End
  • 73rd St: Alzalea Dr. to Forsythia Ave.
  • Forsythia Ave: 72nd St. to New Pavt'
  • Emerald Woods Drive: 76th Street to End 
  • Jaime Lane: 76th Street to End
  • Melinda Court: 76th Street to End

Information for Property Owners

84th Street Hanna Lake Avenue to East Paris Avenue Reconstruction 04/10/23 07/14/23 KCRC Detour for Through Traffic

Reconstruct to 2-lane all-season standard. Work includes tree removal, earthwork, ditches, culvert replacement, HMA pavement, pavement markings and restoration.

Wiersma St. Algoma Ave to Simmons Ave Reconstruction 04/03/23 09/29/23 KCRC Detour

Reconstruction of unpaved road to paved road.

Cascade Road 36th Street to Whitneyville Avenue Reconstruction 04/03/23 06/15/23 KCRC Detour for Through Traffic

Road reconstruction and widening to add dedicated left-turn lane. Cascade Road will be CLOSED to through traffic with a posted detour using 36th Street to Buttrick Avenue. Work includes earthwork, concrete curb and gutter, storm sewer, drainage, HMA pavement, pavement markings and restoration.

This project will also include construction of a township-funded, non-motorized path on the easterly side of Cascade Road between 36th Street and Kenrob Drive.

10 Mile Road Pine Island Drive to Algoma Avenue Reconstruction 04/03/23 08/31/23 KCRC Detour for Through Traffic

Reconstruct to 2-lane all-season standard. Work includes tree removal, earthwork, ditches, culvert replacement, water main (Plainfield Twp), HMA (hot mix asphalt) pavement, pavement markings and restoration. (Tree removal began March 27).10 Mile Road is scheduled to be open to traffic by August 7 with final restoration completed by October 28, 2023.

Pine Island Drive House Street and 10 Mile Road Utility Work 03/27/23 07/07/23 Utility Lane shift

16-inch water main installation along the west side of Pine Island Drive from House Street to 10 Mile Road. Work will be completed under two-way lane shifts.

100th Street East Paris Avenue to Patterson Avenue Tree Work 01/20/23 02/03/23 KCRC Expect Delays

This phase of construction along Cascade Road will consist of tree removal. Traffic Control provided by SavATree will include flagging operation and associated signage.

84th Street Hanna Lake Avenue to East Paris Avenue Tree Work 01/09/23 01/20/23 KCRC Lane Closures

This particular phase of construction on 84th Street will consist of tree removal. Traffic Control provided by Integrity will include portable stop/go lights (mechanical flaggers). 

The anticipated start date of the all-season reconstruction project on 84th Street is scheduled to begin 04/03/2023.